CONSTRUCTION OF A COMMERCIAL DEVELOPMENT AT LEWIS STREET,LAGOS ISLAND NIGERIA
Duration – 18 MONTHS
Status – Completed
Scope:
• Foundation works
• Concrete works
• Rebar works
• Blockworks
• Electrical works
• Plumbing works
• Plastering works
• Roofing works
• Floor tiling & Ceiling finishes
• Window & Door Finishes
• Glass Curtain wall finishes
• Painting finishes
• Plumbing & Electrical Fitout
• Septic and soak

CORRECTIVE MAINTENANCE OF HVAC LEAKAGE AND BUILDING FINISHES AT ONIRU V/ISLAND LAGOS, NIGERIA
Duration – 1 Week
Status – Completed
Scope:
• POP Ceiling removal
• Brickwall Demolition works
• Tile hacking works
• Plumbing works
• Plastering works
• Facing brick works
• Floor tile finishes
• POP Ceiling
• 3D wall finishes
• Wall painting etc

RENOVATION/REMODELLING OF A COMMERCIAL BUILDING AT – KOKA, ASABA-DELTA STATE
Duration – 1 Month
Status – Completed
Scope:
• Demolition works
• Roofing works
• Block works
• Plastering works
• False cladding works
• Floor tile finishes
• Marble counter top works
• POP wall & ceiling finishes
• Steel doors finishes
• Plumbing & Electrical works
• Glass doors/windows
• Wall & Steel painting
• double leaf gate wor

RENOVATION OF A COMMERCIAL BUILDING AND CONSTRUCTION OF BUS TERMINAL AT OKOTA.
Duration – 1 Month
Status – Completed
Scope:
• Demolition works
• Steel canopy works
• Roofing works
• Block works
• False cladding works
• Plastering works
• Wall& Floor tile finishes
• Marble counter top works
• POP wall & ceiling finishes
• Steel/Flush doors finishes
• Plumbing & Electrical works
• Wall & Steel painting
• Collapsib

RENOVATION OF A RESIDENTIAL BUILDING AT BORNO WAY YABA
Duration – 4 Months
Status – Completed
Scope:
• Demolition works
• Concrete works
• Block works
• Plastering works
• Plumbing works
• Electrical works
• POP wall & ceiling finishes
• 3D wall panel finishes
• Steel/Flush doors finishes
• Tiling wall & floor finishes
• Stamped concrete floor finishes
• Car ports
• Main Gate relocation works

REHABILITATION/UPGRADING OF OGUNLANA DRIVE/ADELABU AT SURULERE
Duration – 4 Months
Status – Completed
Scope:
• Demolition works
• Earth works
• Block walls
• Concrete works
• Drain setting works
• Median Barrier works
• Column stub works
• Street lighting works
• Kerb works
• Box Culvert works
• Sand subbase filling works
• Stonebase grading works
• Compacting works
• Asphalting works
• Service ducts works